Reports and Documents

/, Reports and Documents/Greene County Multimodal Corridor Study – 2009

Greene County Multimodal Corridor Study – 2009

Report Cover

The Thomas Jefferson Planning District Commission was awarded a VDOT Multimodal Planning Grant to develop multimodal transportation solutions and land use strategies for Greene County, while addressing regional travel needs on the US 29 and 33 corridors. Through a competitive process, the Renaissance Planning Group was awarded a contract to conduct scenario planning workshops with County residents to determine a preferred future land use scenario and to prepare a modeling analysis of the transportation needs required to achieve this scenario. The five key goals of the Study were to:

  • Create safe multimodal transportation options.
  • Improve access to and between area businesses.
  • Coordinate land use planning and transportation in the Greene County Comprehensive Plan update.
  • Identify and prioritize cost-effective public and private transportation recommendations.
  • Coordinate with the larger VDOT US 29 Corridor Study.

  Greene County Multimodal Corridor Study (2009)

2016-12-20T22:15:52+00:00 September 18th, 2009|